August 24, 2024
1. Design Control Submittal At Site
2. Creating Multiple Revisons on Control Submittal
3. DDC Sizing at Site And Changing Panel
4. Standard Input Output Point Tagging Not Appropriate
5. Input Output Point Tag Mismatch Between Database And DDC Program
6. Alarms And Trends Configure in Database For All The Points Instead Necessary Points
7. Graphics Navigation For Equipments Not Followed In Sequence
8. Zone Mask Not Configure In 3D Floor Plan
9. Consistently Not Generate Building Automation Analysis Report and Not Reviewing With BMS Consultant
October 16, 2025
October 15, 2025
October 16, 2025
October 10, 2025
October 6, 2025
September 29, 2025
September 26, 2025
September 23, 2025
September 3, 2025
September 2, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 1, 2025
September 20, 2024
September 13, 2024
September 5, 2024
August 31, 2024
August 28, 2024
May 14, 2024